The switch's queue scheduling: every frame from the coprocessor waits in queue 0, 2026-10-25
Discovery 20 of the discoveries.
Each port of the 88E6193X in front of the XGS 3300's and the XGS 136's ports has eight egress queues,
and their scheduling runs from weighted on all eight to strict priority on all of them - read on
2026-10-22 as weighted on every port, and taken then to be free to use. Measured on the second XGS
3300 (SFOS 22's coprocessor software), where a stream can be made to queue, and read on the first
(SFOS 23's) and the XGS 136 (SFOS 21's), with octep.ko 6cde3fde and npuep.ko 590205fb
(images/deploy/lab-qsched-report.sh; the long forms lab-qsched.sh, lab-qsched-conn.sh,
lab-qsched-queues.sh).
The whole page, with how it was taken and what it does not show: The switch's queue scheduling: every frame from the coprocessor waits in queue 0, 2026-10-25.
The discussion of this page is held in the project's GitHub Discussions. Showing it here loads giscus from giscus.app and GitHub, and writing in it needs a GitHub account - what that means.